Project Update | 6-8 Richmond Road, Rose Bay
MESO Solutions is proud to share an update from our project in Rose Bay, delivered in partnership with our client, Harvestland. This luxury residential development will feature 5 residential units and a one level basement, located only streets away from Rose Bay wharf.
Perimeter Installed
The MESO Team has made steady progress across site. Pre-drilling and sheet piling are complete. This unique project uses a combination of piling systems, with MESO Solutions delivering the steel sheet piles to form the perimeter. Bulk excavations are underway as this site prepares for the next phase.
We deliver – with innovation, precision and excellence.
MESO Mavericks
Behind the progress of each project is our highly skilled grounds team, who bridge the gap between design and execution and understand exactly what's at stake, adapting to real ground challenges.
MESO Rigs
A large orange MESO Solutions excavator fitted with a hydraulic piling attachment operates within an excavated site, with the operator visible in the cab. A red mobile work platform and a second worker are visible in the background alongside concrete retention
Teamwork On SIte
Working against some challenging site conditions, the MESO crew is moving ahead with pre-drilling and sheet piling to complete the perimeter at our Rose Bay site.
High Precision
MESO crew working with precision on site to push progress ahead on site with pre-drilling and sheet piling.
Pre-Drilling At Rose Bay
Pre-drilling and sheet piling works underway at our Rose Bay site, with the perimeter nearing completion.
Site Overview
Bulk excavation and sheet piling works are in progress at our Rose Bay site, with the grounds team wrapping up the piling phase.