Seychelles
Brighton-Le-Sands
3 level basement
close to a heritage listed building
Description
3 levels of basement.
Challenges
Heritage shoring. Shoring extremely close to a heritage listed building.
High water table and loose sand soil conditions.
MESO’s Innovative Solutions
Heritage-sensitive shoring. Minimally invasive shoring techniques designed to protect structural integrity.
Comprehensive anchoring. 5 Rows of Anchoring systems stabilising the site.
Historical building support systems. MESO engineered and installed steel systems supporting fragile heritage listed building.