Casa Capri
Cronulla
1 level basement
Description
1 level basement for a three full floor luxury boutique suites positioned only moments from the centre of Cronulla.
Challenges
Loose sand soil conditions. Managing the stability of the site with loose sandy soil.
MESO’s Innovative Solutions
Anchoring and bracing systems. Utilised a combination of anchoring and bracing systems to stabilise the site and ensure structural integrity.