The Avenues
Zetland
Three basements with 2 levels.
Description
Three basements with 2 levels, delivered for a neighbourhood development in Zetland for our client Deicorp.
Challenges
Scale of development. Multiple basements developing simultaneously.
Adjacent buildings. Working close to neighbouring structures and underground services.
Ground conditions. Soil type and groundwater challenges on site.
MESO’s Innovative Solutions
New technology. Utilising our newest piling rigs and gear for maximum efficiency and capability.
Groundwater management. Permeation grouting and dewatering systems to support the site and manage soil and groundwater conditions.
Pits. Installed for additional support.